Manette Bridge closure May 2

The Manette Bridge will be closed May 2 two separate times to accommodate filming of the independent movie “Better Than Love.” The bridge will be closed to both pedestrian and vehicle traffic from 8:00 a.m. to 1:00 p.m. and then again from 8:00 p.m. to 12:00 midnight.

The Manette Bridge will be closed May 2 two separate times to accommodate filming of the independent movie “Better Than Love,” according to a press release from the City of Bremerton.

The bridge will be closed to both pedestrian and vehicle traffic from 8:00 a.m. to 1:00 p.m. and then again from 8:00 p.m. to 12:00 midnight.

The detour route utilizes the Warren Avenue Bridge:  from the west end of the Manette Bridge,

continue north on Washington Avenue, then west on 11th Street to Warren Avenue; turn north on Warren Avenue; continue north across the Warren Avenue bridge, exiting to Callahan Drive. Continue on Callahan to Lower Wheaton Way, then follow Lower Wheaton Way back into Manette.

 

Tags: